Zoning

Documents

The Municipality of Chester, as with all municipal units in Nova Scotia, has a set of official planning documents that have been formally adopted by Council. They are:

  • Municipal Planning Strategy (and maps) - a document that sets the direction for future land use in the Municipality through a series of policies. These policies deal with residential, commercial, institutional, and industrial land use, and with service matters such as solid waste collection and disposal, sewage and treatment systems, and recreation.
  • Land Use By-law - a document that divides the Municipality into zones, states the uses permitted in each zone, and provides requirements for each zone, including minimum lot size, setbacks from property lines, and height. Residential use includes standards for density, while other areas may include specific design requirements.
  • Subdivision By-law - a document that sets out the rules under which property may be subdivided. This includes requirements for the approval of plans of subdivision and sets out the procedure for review of proposed subdivisions.

There is also a Secondary Planning Strategy and a Land Use By-law for the Village of Chester and surrounding area. These documents provide land use policies and zoning regulations that reflect the distinct character of the Village.

back to top

More about Zoning

A "zone" is a specified area of land in which uses are permitted and development standards, such as height and setback from the property line, are applied.

The types of zones are:

  • Residential: A zone that permits housing. This zone varies based on desired density – whether single family dwellings or multi-unit buildings. Sometimes design standards are required, such as in the Village of Chester.
  • Commercial: A zone that permits many types of retail and service use, such as stores, restaurants, gas stations, motels and banks. The list of possibilities is quite long. Mostly, commercial zones are in the Village but do exist in Mill Cove as well. These uses usually require more parking than in other zones.
  • Institutional: A zone that permits uses that serve the public such as schools, hospitals, churches, fire halls and community centres. Normally, these uses are in larger buildings which require larger lots than other zones.
  • Industrial: a zone that permits operations like boat yards and marinas in the Village. It does not exist in elsewhere in the District.
  • General Basic: This is a kind of rural development zone where all uses are permitted – residential, commercial, institutional, industrial, including larger manufacturing or processing facilities. There are no established standards for development. Some developments, however, require special approvals because they could potentially impact the environment, or could lead to an intensity of use that requires analysis.

back to top

Zoning Confirmation Letters

A zoning confirmation letter is often requested prior to the sale of a property to obtain information on any permits and approvals issued by the Municipality for the property. The letter includes a review of any development permits issued for the property and information on any known Land Use By-Law violations against the property. A zoning confirmation letter also includes a review of any building permits issued for the property.

Process for obtaining a zoning confirmation letter:

  • The cost is $30.00 per property, and payment is due at the time the request is submitted. We do not enter the request for processing until payment is received. Any requests for the Town of Mahone Bay MUST be submitted directly to the Town Office in Mahone Bay. You can call the Town Office at (902) 624-8327 for further assistant.
  • We require a minimum of 10 business days to process the request.
  • If requesting confirmation that an existing building complies with current Land Use By-Law setbacks, please include the submission of a current location certificate or plan of survey, prepared by a professional surveyor.
  • If comments on the existing or proposed use are required, please declare the use in the request submitted to our office.

back to top